Ares del Bosque

Mobility and services

Luz de Ares

Small infrastructure improvements can have a major impact on the long-term viability of small rural settlements.

Real photograph of two electric vehicles in Ares del Bosque. This is not a visualisation of the future charger.
Real photograph of two electric vehicles in Ares del Bosque. This is not a visualisation of the future charger.

Electric mobility is already present

The photograph documents two electric vehicles in Ares. The project does not start from an invented number of interested people: it proposes checking the real need and studying a shared solution for residents and visitors.

The idea

Assess whether a new lighting column could integrate smart public charging, with load balancing, and potentially serve two spaces.

Existing example of an integrated solution; it does not represent the location or final design for Ares.
Existing example of an integrated solution; it does not represent the location or final design for Ares.

Product information to be verified

Product information to be verified

Market references include solutions with two Type 2 connectors, a published configuration of up to 2 × 11 kW AC, load balancing, RFID and OCPP. Everything must be verified for Spain, the local grid and the exact location.

Existing example of an integrated solution; it does not represent the location or final design for Ares.

Proposed route

01Listen to residents
02Speak with the Town Council
03Assess locations
04Study grid and connection
05Review Spanish rules
06Request a technical quotation
07Define payment and management
08Investigate funding
09Consider one pilot
10Evaluate for 6–12 months
11Decide any next step

Necessary checks

Grid capacityNew electrical connectionREBT and ITC-BT-52Royal Decree 184/2022 and AFIRPermitsAccessibility and road safetyImpact protectionParking and signsCivil worksPayment and identificationMaintenanceInsurance and liability

The wiring of a conventional streetlight is not assumed to be suitable for EV charging.

Support the feasibility study

Support the feasibility study

I support Benasau Town Council and the relevant technical parties studying the feasibility of installing a smart public charging point integrated into a streetlight in Ares del Bosque. This statement supports the study and does not approve a location, budget or final technical solution.

This independent platform is developed free of charge by Baja Verde S.L.U. to contribute to information, participation and quality of life in Ares del Bosque.